|
Important Read
Before Installation!
Always wear proper
safety equipment.
The pipe must be within
AWWA standards and
verify by measuring the
outside diameter of pipe.
First make sure the
gland is still in the full,
open position and did
not move during
shipping.Cut the pipe
square to length and
remove any fins or burrs.
It is not necessary to
remove factory-made
bevels. Examine and
clean the One Bolt
socket, removing all dirt
and debris.
|